P C Construction's contract work included.The supply of plant and labour to place concretefoundation, construct the gabion walling andthe placement of backfill.
Total m3: 320
Maximum Height: 2m
Construction Time: 1 weeks
Mansell, Hackney, London
P C Construction's contract work included.The supply of plant, labour and materialsto construct the gabion walling.Gabion walling was used to retain an embankment on a new School.
Total m3: 650
Maximum Height: 3.5m
Construction Time: 2 weeks
Oliver Connell & Son, Manchester Airport
Gabion walling was used to retain the cuttings on the new radar station at Manchester Airport. P C Construction's contract work included. The supply of plant and labour to construct the gabion wall.